Example · Instruction following
Instruction following · 12 items · 4 models · run run_example_rules
Example record
Evaluation status
Completed · every request has an outcome
48 / 48 requests have an outcome
Budget
$0.0211 of $0.5
An estimate-based stop on our side: scheduling ends when the next worst-case request no longer fits. The output cap per request is what the provider enforces.
Challenge commitment
4ee9401d9d…8e4b5687
Revealed 2026-11-25: payload and nonce are published and can be checked.
Report hash
33e5b16a8d…209b5a09
SHA-256 of the canonical report. Any change to an answer, grade or cost changes it.
Comparison
Accuracy is correct answers over graded answers. Failed, skipped and ungradable requests are listed on their own and never counted as wrong.
| Model | Accuracy | Cost per task | Total cost | Median latency | Outcomes |
|---|---|---|---|---|---|
| Stand-in A · steadysim · steadycap 512 · $1 in / $5 out per MTok | 75.0%9/12 graded | $0.000197 | $0.00236 | 827 msp90 969 ms | 9 correct, 3 incorrect |
| Stand-in B · fast and carelesssim · swiftcap 512 · $0.2 in / $0.8 out per MTok | 41.7%5/12 graded | $0.0000388 | $0.000466 | 221 msp90 254 ms | 5 correct, 7 incorrect |
| Stand-in C · reports no usagesim · quietcap 512 · $0.5 in / $2 out per MTok | 66.7%8/12 graded | unavailable | unavailableno usage reported | 483 msp90 561 ms | 8 correct, 4 incorrect |
| Stand-in D · unreliable endpointsim · flakycap 512 · $2 in / $8 out per MTok | 75.0%9/12 graded | $0.000383 | $0.0046 | 791 msp90 1.33 s | 9 correct, 3 incorrect |
Every request
One cell per model and item. Choose a cell to read the task, the saved response and the reason for its grade.
| Item | A Stand-in A · steady | B Stand-in B · fast and careless | C Stand-in C · reports no usage | D Stand-in D · unreliable endpoint |
|---|---|---|---|---|
| q01 Instruction | ||||
| q02 Instruction | ||||
| q03 Instruction | ||||
| q04 Instruction | ||||
| q05 Instruction | ||||
| q06 Instruction | ||||
| q07 Instruction | ||||
| q08 Instruction | ||||
| q09 Instruction | ||||
| q10 Instruction | ||||
| q11 Instruction | ||||
| q12 Instruction |
- A Stand-in A · steady
- B Stand-in B · fast and careless
- C Stand-in C · reports no usage
- D Stand-in D · unreliable endpoint
q01 · Instruction following · Stand-in B · fast and careless
Rules not met: exactLines.
Task sent to the model
Write a slogan for a night train. Rules: 1. Write exactly 1 non-empty line. 2. WRITE EVERYTHING IN UPPERCASE. 3. Use at most 8 words in total. 4. End the reply with "!". 5. Do not use the word "very" (longer words that merely contain it are fine). Counting: a word is any run of characters between spaces or line breaks that contains a letter or a digit. A line marker such as "-" is not a word; a required opening is. Reply with the text only.
Saved response
CALM! CALM!
- Cost
- $0.0000352
- Latency
- 237 ms
- Tokens
- 164 in / 3 out
- Attempts
- 1 · finish stop
grader instructions@2 · reason rules-broken: exactLines · read from the reply: 2 words, 2 lines
Grading rule
{
"type": "instructions",
"version": 2,
"rules": [
{
"rule": "exactLines",
"value": 1
},
{
"rule": "allUppercase"
},
{
"rule": "maxWords",
"value": 8
},
{
"rule": "endsWith",
"value": "!"
},
{
"rule": "excludesWord",
"value": "very"
}
]
}Solana records
Optional. A memo transaction gives a hash a public timestamp and a signer. It records data: it does not check an answer, and no program on Solana enforces how this evaluation was run.
Example records ship with the app and are not anchored. Start a run of your own to try anchoring on devnet.